top of page

Tukwila International Blvd Bus Loop Pavement Rehabilitation
Removal of existing asphalt and installation of new pavement within the bus loop
Removed existing asphalt, removed and repalced PCC panels, removed and replaced concrete curb, install erosion control and temporary parking lot signs, removed video detection loops and install detection camera on existing poles.
Power in Numbers
Programs
Locations
Volunteers
Project Gallery
bottom of page