About the Project
Improvements on S 56 th St corridor by providing pavement resurfacing
including asphalt grind and overlay, concrete panel replacement, upgrading curb ramps,
driveways and sidewalks to meet ADA requirements. Installing streetlights and signal
interconnect, upgrading traffic signal infrastructure, sewer replacement, remove and
replace striping and install signage.
Completion Date:
August 2022