top of page

56th St and Cirque Dr Corridor Improvements Phase 2

Tacoma, WA, USA

Job Type:

Removal and replacement

About the Project

Improvements on S 56 th St corridor by providing pavement resurfacing
including asphalt grind and overlay, concrete panel replacement, upgrading curb ramps,
driveways and sidewalks to meet ADA requirements. Installing streetlights and signal
interconnect, upgrading traffic signal infrastructure, sewer replacement, remove and
replace striping and install signage.

Completion Date: 

August 2022

Head Office

127 Mashell Ave N 

PMB #53

Eatonville, WA 98328

253-255-8154

global contractors.com

Inquiries

For any inquiries, questions or commendations, please call: 253-255-8154

© 2023 by Global Contractors LLC.

bottom of page